WebNovels

Chapter 14 - Chapter 14

The late spring sunlight spilled across Lucas's desk, casting a warm glow on the stacks of planning documents. Outside his office window, the sounds of Elysion Park carried in on the breeze — laughter from the Wild Mouse's final turn, the distant drums from Jungle Splash Adventure, and the occasional cheerful chime from the carousel in Explorer's Landing.

It had been just over seven weeks since the grand opening, and the difference was staggering. Visitor numbers had exceeded his most optimistic forecasts. Still, he needed to know exactly where the park stood — both in real finances and in system resources.

"System," Lucas thought, leaning back in his chair, "show me the current funds."

A translucent display flickered into view in his mind.

---

📊 Current Balance — May 15th, 2016

Park Budget (real funds): €2,650,200

System Funds (project use only): €12,381,000

---

Lucas stared at the numbers for a moment, letting them sink in. Twelve million in the system… more than enough to completely transform the park. The thought alone sent a rush of ideas through his head — immersive theming, upgraded pathways, expanded landscaping, maybe even a full storyline tying all the areas together.

Before he could dwell on it, the system pulsed again and a new panel appeared.

---

💡 System Proposal – Park-Wide Theming Overhaul

Goal: Bring all zones to a visual and experiential quality equal to, or exceeding, Explorer's Landing.

Scope:

Full façade upgrades for all attractions

Cohesive themed walkways between zones

New props, lighting, and landscaping throughout

Background music and ambient soundscapes for every zone

Story integration between rides and areas

Estimated Duration: 5 months (work completed during park operation with minimal closures)

Cost Options:

1. Premium Level (Max Detail) – €10,000,000 (Highest quality, custom sculpted rockwork, hand-painted details)

2. High Level – €7,000,000 (High-quality theming, mix of custom and prefabricated elements)

3. Medium Level – €4,000,000 (Strong visual upgrade, mostly prefabricated elements)

4. Basic Level – €2,500,000 (Simple, clean, presentable look without heavy storytelling)

---

Lucas's pulse quickened. This wasn't just about improving the park — this was about cementing Elysion Park as a must-visit destination in Europe.

He rested his elbows on the desk, glancing out toward the park entrance where new guests were streaming in. "If I do this right," he thought, "this place won't just be popular — it'll be unforgettable."

The question was… which level to choose?

Lucas tapped his pen against the desk, eyes fixed on the four options floating in his mind.

Basic and Medium… no. That would only make things look decent, not unforgettable.

High Level… tempting, but still missing that final layer of magic.

His gaze lingered on the top option: Premium Level – €10,000,000.

It was bold. It was risky. And it would consume the lion's share of his system funds. But it would also deliver the kind of transformation people would talk about for years.

He leaned back in his chair, recalling the moment guests first stepped into Explorer's Landing on reopening day — the gasps, the smiles, the way phones instantly came out for photos. That was the reaction he wanted park-wide.

"System," Lucas said firmly in his thoughts, "select Option 1 — Premium Level."

---

✅ Confirmation – Premium Level Theming Overhaul Selected

Cost: €10,000,000 (System Funds)

Remaining System Funds: €2,381,000

Work Begins: Tonight after park close

Estimated Completion: October 15th, 2016

---

Outside his office window, the May sunlight glinted off the carousel's golden trim. Somewhere beyond, Jungle Splash Adventure sent another boat plunging into its final drop, cheers echoing over the water.

The system pulsed again, showing an overview map of the park — each zone now outlined in a shimmering gold border. When the work began, it would progress zone by zone, ensuring attractions stayed open as much as possible.

A smile tugged at Lucas's lips. "Let's give them something they've never seen before.

Lucas swiveled his chair toward the computer screen and opened the park's internal communication system.

This news couldn't just quietly slip in — it needed to be an official moment, something both staff and loyal guests could look forward to.

He typed carefully:

---

📢 Elysion Park Announcement – May 15th, 2016

Elysion Park is proud to announce the start of the largest transformation project in its history.

Over the coming months, every area of the park will receive a full theming upgrade to match or exceed the immersive quality of Explorer's Landing. Expect new façades, detailed landscaping, atmospheric music, and cohesive storytelling connecting every zone.

The work will be carried out with minimal ride closures, ensuring guests can continue to enjoy their visit while we build the future of Elysion Park.

And there's more… discussions are underway for the addition of a brand-new major attraction. While details are still under wraps, we can promise that it will be unlike anything currently in the park. Stay tuned for updates in the coming weeks.

Estimated project completion: October 15th, 2016.

---

He read the announcement one last time, smiled, and pressed Send. Within seconds, it appeared on the park's website, social media, and the internal staff network.

Outside, the cheerful chime of the carousel rang once more. For a moment, he imagined how that sound would soon blend with new music, fresh stories — and perhaps even the first echoes of a brand-new attraction.

That night, long after the last guests had left and the glow from the carousel lights faded, Elysion Park transformed.

Lucas stood just inside the main gates, the crisp night air carrying the scent of fresh paint and sawdust. The system's renovation crew moved in with quiet precision — trucks rolling in through the service roads, pallets of themed props being unloaded, and scaffolding rising around the older façades.

Explorer Zone was the first to be touched. Workers draped protective sheets over Max Around the World's station while others marked the pathway edges for a new patterned stone surface. Near the Sky Balloon Voyage, crates labeled Custom Sculpted Rockwork – Handle with Care waited to be opened.

Lucas walked the length of the main pathway with Walter at his side. "Five months," he murmured. "By the end of it, people won't even recognize this place."

Walter gave a low whistle. "It's ambitious… but it'll turn heads."

As they passed the Jungle Zone's entrance, Lucas's gaze lingered on a fenced-off plot of land just beyond Secrets of the Silk Road. For now, it was dark and empty — but in his mind, he could already see the outline of something new rising there.

The system pulsed softly in his thoughts.

---

[Note] – Feasibility analysis for new major attraction site:

Location confirmed: Adjacent to Secrets of the Silk Road

Preliminary space requirements met.

Potential concepts: Water-based dark ride, suspended family coaster, or hybrid adventure attraction.

Full proposal available upon request.

---

Lucas allowed himself a small grin. Not yet, he thought. First, the park's heart and soul needed to be rebuilt. Then, the new addition could make its entrance.

Overhead, the hum of construction lights mingled with the rhythmic tap of hammers. Elysion Park's rebirth had begun.

More Chapters