After the pump was put into use, the issue of brine which was limiting the efficiency of salted fish production immediately vanished, and there was even an excess of brine.
The mass-produced peat from the alchemical assembly line, coupled with the spring gear-driven pump, along with an extremely rich variety of fish, made the boiling salt process the only limitation on the salted fish production line.
However, Horn did not intend to blindly expand production, as having enough salt to eat was sufficient. Being surrounded by swamps and mountains in Daze Village, they couldn't sell it anyway.
Now the Mountain Copper Workshop, Mortar Workshop, and even the reconstruction of the small town all needed manpower.
After solving the food problem, the second issue was the housing in the small town.
Sitting in the study of the side hall, Horn lowered his head to review the report submitted by Vite on the desk, occasionally making notes.